| Year | Make | Model | Lot Description | Hammer Price | |
|---|---|---|---|---|---|
|
|
2004 | MIQ PARTNERS | 2004 CARTRIDGE PRINTING MACHINE |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; VIDEOJET 7330 LASER VISION SYSTEM; (2) PRINTEX G8-60/85 AUTOMOTIVE WIPER HOUSING PRINTERS; ICON VISION SYSTEM; TEXT VISION SYSTEM; OFFLOAD - REJECT ASSEMBLY; (2) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 8FT AND 8.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES; FUMEX FA1-D AIR FILTRATION & FUME EXTRACTION SYSTEM; WHISPERFLOW FILTRATION SYSTEM.
|
🔒 Subscribe |
|
|
2003 | MIQ PARTNERS | 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE |
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: SUBASSEMBLY LOAD; 20-BAY CARTRIDGE HOUSING STACKER WITH (2) DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOTS; (2) CVF IN060 VIBRATORY FEEDERS; DESICCANT PRESENCE VISION SYSTEM; PIERCER PRESENCE VISION SYSTEM; (2) BRANSON 2000XD ULTRASONIC WELDERS; PCB READ WRITE ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (4) BIMBA PNEUMATIC CYLINDERS; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 14.5 AND 8FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2000 |
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: (1 EACH) PCB LOAD AND UNLOAD ASSEMBLIES WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOTS; PLASMA TREATMENT ASSEMBLY WITH ENERCON BLOWN-ION SERIES PLASMA TREATER; NEST CLOSE ASSEMBLY; SAM DISPENSER; SAM INSPECT PLATFORM WITH 15-PLACE ACCUMULATOR; (2) DI WASH ASSEMBLIES; (2) LIFT & DRY ASSEMBLIES; (7) PCB FAN DRY ASSEMBLIES; (3) CHEMICAL DISPENSE VISION ASSEMBLIES WITH NORDSON EFD PICO TOUCH CONTROLLERS; TREHALOS VISION SYSTEM WITH PICO TOUCH CONTROLLER; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) US MOTORS ELECTRIC BLOWERS; DORNER 7.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2000F |
MIQ PARTNERS 2000F PRODUCTION CELL LINE
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 8020 MODULAR CLEANROOM ENCLOSURE |
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO THE CABLE TRAY, NO CONTENTS]
|
🔒 Subscribe | |
|
|
LIBERTY PUMPS | 1102/LEH103M |
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2001 PCBA TO FLUIDIC MACHINE |
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER WITH QUIKLOK STAND. SYSTEM INCLUDES: PCBA AND FLUIDIC LOAD ASSEMBLIES; (4) TAPE ASSEMBLIES WITH DENSO HM-40602M-W 4-AXIS 600MM SCARA INDUSTRIAL ROBOTS; (4) ROLL ASSEMBLIES; SEALING WAX DISPENSE ASSEMBLY WITH NORDSON EFD PICO TOUCH CONTROLLER; WAX CHECK ASSEMBLY; HEAT EMBOSS ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (13) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) DORNER 7.5, 7.75, AND 9.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2008 | MIQ PARTNERS | 2008 FLUIDIC PROCESSING MACHINE |
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: 20-BAY CARTRIDGE HOUSING STACKER WITH DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOT; CALIFORNIA VIBRATION FEEDERS, INC. PIEZO DISK LOADER; UV DISPENSE ASSEMBLY; UV CURE & CAMERA ASSEMBLY; (6) BIMBA PNEUMATIC CYLINDERS; (2) WAX DISPENSE ASSEMBLIES WITH DENSO HSR048A1-N17-W5N 4-AXIS 480MM SCARA INDUSTRIAL ROBOTS WITH TP-RC7/8 TEACH PENDANT AND NORDSON EFD PICO TOUCH CONTROLLERS; WAX REFLOW ASSEMBLY; LEAK TEST STATION WITH ZAXIS ISAAC HD 4-CHANNEL MULTI-FUNCTION LEAK DETECTOR; CORONA TREATMENT ASSEMBLY; PRINTEX G8-100/115 3-POSITION PAD PRINTER WITH MITSUBISHI GOT2000 GRAPHIC OPERATION TERMINAL; PRINT CHECK VISION SYSTEM; CVF IN060 VIBRATORY FEEDER; OFFLOAD - REJECT STATION; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 9.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2002 REAGENT/PELLET LOADING MACHINE |
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: FLUIDIC LOAD GANTRY ASSEMBLY; (3) BIMBA PNEUMATIC CYLINDERS; (3) CVF IN060 VIBRATORY FEEDERS [ONE MISSING BOWL]; (3) CVF IN0300 VIBRATORY FEEDERS; STOPPER LUBE ASSEMBLY; DENSO VP-6242M 6-AXIS ROBOT ARM; A05 SHUTTLE INSERT ASSEMBLY; PELLET INSPECTOR; LYO PELLET LOADER WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOT; SHUTTLE LYO PRESENCE VISION SYSTEM; SEAL LOADER; FLUID PATH ASSEMBLY WITH TMB BUFFER AND COLE-PARMER MASTERFLEX L/S PUMP DRIVE WITH EASY-LOAD 77200-30 CARTRIDGE; DROPLET DETECT EQUIPMENT; FLUID CHECK ASSEMBLY; LEAK CHECK STATION WITH ZAXIS LEAK DETECTOR; FOIL PUNCH & PLACE ASSEMBLY; FOIL TRANSFER ASSEMBLY; DOUBLE TRANSFER STATION; OFFLOAD - REJECT ASSEMBLY; (6) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 9.5FT AND 14.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2001 PCBA TO FLUIDIC MACHINE |
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER AND DELL LATITUDE 5501 LAPTOP COMPUTER WITH QUIKLOK STAND. SYSTEM INCLUDES: PCBA AND FLUIDIC LOAD ASSEMBLIES; (4) TAPE ASSEMBLIES WITH DENSO HM-40602M-W 4-AXIS 600MM SCARA INDUSTRIAL ROBOTS; (4) ROLL ASSEMBLIES; SEALING WAX DISPENSE ASSEMBLY WITH NORDSON EFD PICO TOUCH CONTROLLER; WAX CHECK ASSEMBLY; HEAT EMBOSS ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (14) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) DORNER 7.5, 7.75, AND 9.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2008 | MIQ PARTNERS | 2008 FLUIDIC PROCESSING MACHINE |
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: 20-BAY CARTRIDGE HOUSING STACKER WITH DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOT; CALIFORNIA VIBRATION FEEDERS, INC. PIEZO DISK LOADER; UV DISPENSE ASSEMBLY; UV CURE & CAMERA ASSEMBLY; (6) BIMBA PNEUMATIC CYLINDERS; (2) WAX DISPENSE ASSEMBLIES WITH DENSO HSR048A1-N17-W5N 4-AXIS 480MM SCARA INDUSTRIAL ROBOTS WITH TP-RC7/8 TEACH PENDANT AND NORDSON EFD PICO TOUCH CONTROLLERS; WAX REFLOW ASSEMBLY; LEAK TEST STATION WITH ZAXIS ISAAC HD 4-CHANNEL MULTI-FUNCTION LEAK DETECTOR; CORONA TREATMENT ASSEMBLY; PRINTEX G8-100/115 3-POSITION PAD PRINTER WITH MITSUBISHI GOT2000 GRAPHIC OPERATION TERMINAL; PRINT CHECK VISION SYSTEM; CVF IN060 VIBRATORY FEEDER; OFFLOAD - REJECT STATION; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 9.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2000 |
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: (1 EACH) PCB LOAD AND UNLOAD ASSEMBLIES WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOTS; PLASMA TREATMENT ASSEMBLY WITH ENERCON BLOWN-ION SERIES PLASMA TREATER; NEST CLOSE ASSEMBLY; SAM DISPENSER; SAM INSPECT PLATFORM WITH 15-PLACE ACCUMULATOR; (2) DI WASH ASSEMBLIES; (2) LIFT & DRY ASSEMBLIES; (7) PCB FAN DRY ASSEMBLIES; (3) CHEMICAL DISPENSE VISION ASSEMBLIES WITH NORDSON EFD PICO TOUCH CONTROLLERS; TREHALOSE VISION SYSTEM WITH PICO TOUCH CONTROLLER; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) US MOTORS ELECTRIC BLOWERS; DORNER 7.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2000G |
MIQ PARTNERS 2000G PRODUCTION CELL LINE
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 8020 MODULAR CLEANROOM ENCLOSURE |
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO THE CABLE TRAY, NO CONTENTS].
|
🔒 Subscribe | |
|
|
LIBERTY PUMPS | 1102/LEH103M |
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP
|
🔒 Subscribe | |
|
|
2005 | MIQ PARTNERS | 2005 CARTRIDGE POUCHING & LABELING MACHINE |
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; CARTRIDGE REJECT ASSEMBLY; (2) CONVEYOR TRANSFER ASSEMBLIES; MAGNEMOTION MAGNEMOVER LITE 700-1708-42 INTELLIGENT CONVEYOR SYSTEM; (2) POUCH OPEN ASSEMBLIES; (2) POUCH SEALING ASSEMBLIES; POUCH REJECT ASSEMBLIES; VIDEOJET VJ9550 PRINT AND APPLY LABELING MACHINE; (2) FINAL VISION CHECK ASSEMBLIES; DENSO VS050A3-AV6-NNN 6-AXIS ARTICULATED ROBOTS; WAND LOAD STATION WITH KEYENCE LIGHT CURTAINS; DESICCANT LOAD STATION; STACKER CAROUSEL; ZAXIS LEAK TESTER ASSEMBLY; PCB CHECK ASSEMBLY; UV CURE ASSEMBLY; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 8.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
2004 | MIQ PARTNERS | 2004 CARTRIDGE PRINTING MACHINE |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; VIDEOJET 7330 LASER VISION SYSTEM; (2) PRINTEX G8-60/85 AUTOMOTIVE WIPER HOUSING PRINTERS; ICON VISION SYSTEM; TEXT VISION SYSTEM; OFFLOAD - REJECT ASSEMBLY; (2) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 8FT AND 8.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES; FUMEX FA1-D AIR FILTRATION & FUME EXTRACTION SYSTEM; WHISPERFLOW FILTRATION SYSTEM.
|
🔒 Subscribe |
|
|
DENSO | TP-RC 7/8 |
DENSO TP-RC 7/8 TEACH PENDANT S/N: 410100-1761
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 8020 MODULAR CLEANROOM ENCLOSURE |
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO THE CABLE TRAY (NO CONTENTS).
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2002 REAGENT/PELLET LOADING MACHINE |
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: FLUIDIC LOAD GANTRY ASSEMBLY; (3) BIMBA PNEUMATIC CYLINDERS; (3) CVF IN060 VIBRATORY FEEDERS [ONE MISSING BOWL]; (3) CVF IN0300 VIBRATORY FEEDERS; STOPPER LUBE ASSEMBLY; DENSO VP-6242M 6-AXIS ROBOT ARM; A05 SHUTTLE INSERT ASSEMBLY; PELLET INSPECTOR; LYO PELLET LOADER WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOT; SHUTTLE LYO PRESENCE VISION SYSTEM; SEAL LOADER; IVEK LIQUID DISPENSER WITH TMB BUFFER AND COLE-PARMER MASTERFLEX L/S PUMP DRIVE WITH EASY-LOAD 77200-30 CARTRIDGE; DROPLET DETECT EQUIPMENT; FLUID CHECK ASSEMBLY; LEAK CHECK STATION WITH ZAXIS LEAK DETECTOR; FOIL PUNCH & PLACE ASSEMBLY; FOIL TRANSFER ASSEMBLY; DOUBLE TRANSFER STATION; OFFLOAD - REJECT ASSEMBLY; (6) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 9.5FT AND 14.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2001 PCBA TO FLUIDIC MACHINE |
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER AND DELL LATITUDE 5501 LAPTOP COMPUTER WITH QUIKLOK STAND. SYSTEM INCLUDES: PCBA AND FLUIDIC LOAD ASSEMBLIES; (4) TAPE ASSEMBLIES WITH DENSO HM-40602M-W 4-AXIS 600MM SCARA INDUSTRIAL ROBOTS; (4) ROLL ASSEMBLIES; SEALING WAX DISPENSE ASSEMBLY WITH NORDSON EFD PICO TOUCH CONTROLLER; WAX CHECK ASSEMBLY; HEAT EMBOSS ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (14) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 7.5, 7.75, AND 9.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2008 | MIQ PARTNERS | 2008 FLUIDIC PROCESSING MACHINE |
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: 20-BAY CARTRIDGE HOUSING STACKER WITH DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOT; CALIFORNIA VIBRATION FEEDERS, INC. PIEZO DISK LOADER; UV DISPENSE ASSEMBLY; UV CURE & CAMERA ASSEMBLY; (6) BIMBA PNEUMATIC CYLINDERS; (2) WAX DISPENSE ASSEMBLIES WITH DENSO HSR048A1-N17-W5N 4-AXIS 480MM SCARA INDUSTRIAL ROBOTS AND NORDSON EFD PICO TOUCH CONTROLLERS; WAX REFLOW ASSEMBLY; LEAK TEST STATION WITH ZAXIS ISAAC HD 4-CHANNEL MULTI-FUNCTION LEAK DETECTOR; CORONA TREATMENT ASSEMBLY; PRINTEX G8-100/115 3-POSITION PAD PRINTER WITH MITSUBISHI GOT2000 GRAPHIC OPERATION TERMINAL; PRINT CHECK VISION SYSTEM; CVF IN060 VIBRATORY FEEDER; OFFLOAD - REJECT STATION; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 9.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2000 |
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: (1 EACH) PCB LOAD AND UNLOAD ASSEMBLIES WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOTS; PLASMA TREATMENT ASSEMBLY WITH ENERCON BLOWN-ION SERIES PLASMA TREATER; NEST CLOSE ASSEMBLY; SAM DISPENSER; SAM INSPECT PLATFORM WITH 15-PLACE ACCUMULATOR; (2) DI WASH ASSEMBLIES; (2) LIFT & DRY ASSEMBLIES; (7) PCB FAN DRY ASSEMBLIES; (3) CHEMICAL DISPENSE VISION ASSEMBLIES WITH NORDSON EFD PICO TOUCH CONTROLLERS; TREHALOSE VISION SYSTEM WITH PICO TOUCH CONTROLLER; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) US MOTORS ELECTRIC BLOWERS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 7.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2000E |
MIQ PARTNERS 2000E PRODUCTION CELL LINE ROOM E
|
🔒 Subscribe | |
|
|
LIBERTY PUMPS | 1102/LEH103M |
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP
|
🔒 Subscribe | |
|
|
2005 | MIQ PARTNERS | 2005 CARTRIDGE POUCHING & LABELING MACHINE |
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; CARTRIDGE REJECT ASSEMBLY; (2) CONVEYOR TRANSFER ASSEMBLIES; MAGNEMOTION MAGNEMOVER LITE 700-1708-42 INTELLIGENT CONVEYOR SYSTEM; (2) POUCH OPEN ASSEMBLIES; (2) POUCH SEALING ASSEMBLIES; POUCH REJECT ASSEMBLIES; VIDEOJET VJ9550 PRINT AND APPLY LABELING MACHINE; (2) FINAL VISION CHECK ASSEMBLIES; DENSO VS050A3-AV6-NNN 6-AXIS ARTICULATED ROBOTS; WAND LOAD STATION WITH KEYENCE LIGHT CURTAINS; DESICCANT LOAD STATION; STACKER CAROUSEL; ZAXIS LEAK TESTER ASSEMBLY; PCB CHECK ASSEMBLY; UV CURE ASSEMBLY; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 8.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
2003 | MIQ PARTNERS | 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE |
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: SUBASSEMBLY LOAD; 20-BAY CARTRIDGE HOUSING STACKER WITH (2) DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOTS; (2) CVF IN060 VIBRATORY FEEDERS; DESICCANT PRESENCE VISION SYSTEM; PIERCER PRESENCE VISION SYSTEM; (2) BRANSON 2000XD ULTRASONIC WELDERS; PCB READ WRITE ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (4) BIMBA PNEUMATIC CYLINDERS; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 14.5 AND 8FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2000 |
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: (1 EACH) PCB LOAD AND UNLOAD ASSEMBLIES WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOTS; PLASMA TREATMENT ASSEMBLY WITH ENERCON BLOWN-ION SERIES PLASMA TREATER; NEST CLOSE ASSEMBLY; SAM DISPENSER; SAM INSPECT PLATFORM WITH 15-PLACE ACCUMULATOR; (2) DI WASH ASSEMBLIES; (2) LIFT & DRY ASSEMBLIES; (7) PCB FAN DRY ASSEMBLIES; (3) CHEMICAL DISPENSE VISION ASSEMBLIES WITH NORDSON EFD PICO TOUCH CONTROLLERS; TREHALOSE VISION SYSTEM WITH PICO TOUCH CONTROLLER; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) US MOTORS ELECTRIC BLOWERS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 7.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2004 | MIQ PARTNERS | 2004 CARTRIDGE PRINTING MACHINE |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; VIDEOJET 7330 LASER VISION SYSTEM; (2) PRINTEX G8-60/85 AUTOMOTIVE WIPER HOUSING PRINTERS; ICON VISION SYSTEM; TEXT VISION SYSTEM; OFFLOAD - REJECT ASSEMBLY; (2) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 8FT AND 8.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES; FUMEX FA1-D AIR FILTRATION & FUME EXTRACTION SYSTEM; WHISPERFLOW FILTRATION SYSTEM.
|
🔒 Subscribe |
|
|
2008 | MIQ PARTNERS | 2008 FLUIDIC PROCESSING MACHINE |
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: 20-BAY CARTRIDGE HOUSING STACKER WITH DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOT; CALIFORNIA VIBRATION FEEDERS, INC. PIEZO DISK LOADER; UV DISPENSE ASSEMBLY; UV CURE & CAMERA ASSEMBLY; (6) BIMBA PNEUMATIC CYLINDERS; (2) WAX DISPENSE ASSEMBLIES WITH DENSO HSR048A1-N17-W5N 4-AXIS 480MM SCARA INDUSTRIAL ROBOTS AND NORDSON EFD PICO TOUCH CONTROLLERS; WAX REFLOW ASSEMBLY; LEAK TEST STATION WITH ZAXIS ISAAC HD 4-CHANNEL MULTI-FUNCTION LEAK DETECTOR; CORONA TREATMENT ASSEMBLY; PRINTEX G8-100/115 3-POSITION PAD PRINTER WITH MITSUBISHI GOT2000 GRAPHIC OPERATION TERMINAL; PRINT CHECK VISION SYSTEM; CVF IN060 VIBRATORY FEEDER; OFFLOAD - REJECT STATION; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 9.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
2003 | MIQ PARTNERS | 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE |
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: SUBASSEMBLY LOAD; 20-BAY CARTRIDGE HOUSING STACKER WITH (2) DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOTS; (2) CVF IN060 VIBRATORY FEEDERS; DESICCANT PRESENCE VISION SYSTEM; PIERCER PRESENCE VISION SYSTEM; (2) BRANSON 2000XD ULTRASONIC WELDERS; PCB READ WRITE ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (4) BIMBA PNEUMATIC CYLINDERS; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 14.5 AND 8FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2002 REAGENT/PELLET LOADING MACHINE |
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: FLUIDIC LOAD GANTRY ASSEMBLY; (3) BIMBA PNEUMATIC CYLINDERS; (3) CVF IN060 VIBRATORY FEEDERS; (3) CVF IN0300 VIBRATORY FEEDERS; STOPPER LUBE ASSEMBLY; DENSO VP-6242M 6-AXIS ROBOT ARM; A05 SHUTTLE INSERT ASSEMBLY; PELLET INSPECTOR; LYO PELLET LOADER WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOT; SHUTTLE LYO PRESENCE VISION SYSTEM; SEAL LOADER; IVEK LIQUID DISPENSER WITH TMB BUFFER AND COLE-PARMER MASTERFLEX L/S PUMP DRIVE WITH EASY-LOAD 77200-30 CARTRIDGE; DROPLET DETECT EQUIPMENT; FLUID CHECK ASSEMBLY; LEAK CHECK STATION WITH ZAXIS LEAK DETECTOR; FOIL PUNCH & PLACE ASSEMBLY; FOIL TRANSFER ASSEMBLY; DOUBLE TRANSFER STATION; OFFLOAD - REJECT ASSEMBLY; (6) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 9.5FT AND 14.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2000D |
MIQ PARTNERS 2000D PRODUCTION CELL LINE ROOM D
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2001 PCBA TO FLUIDIC MACHINE |
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: PCBA AND FLUIDIC LOAD ASSEMBLIES; (4) TAPE ASSEMBLIES WITH DENSO HM-40602M-W 4-AXIS 600MM SCARA INDUSTRIAL ROBOTS; (4) ROLL ASSEMBLIES; SEALING WAX DISPENSE ASSEMBLY WITH NORDSON EFD PICO TOUCH CONTROLLER; WAX CHECK ASSEMBLY; HEAT EMBOSS ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (14) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 7.5, 7.75, AND 9.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 8020 MODULAR CLEANROOM ENCLOSURE |
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO THE CABLE TRAY (NO CONTENTS).
|
🔒 Subscribe | |
|
|
LIBERTY PUMPS | 1102/LEH103M |
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP
|
🔒 Subscribe | |
|
|
2005 | MIQ PARTNERS | 2005 CARTRIDGE POUCHING & LABELING MACHINE |
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; CARTRIDGE REJECT ASSEMBLY; (2) CONVEYOR TRANSFER ASSEMBLIES; MAGNEMOTION MAGNEMOVER LITE 700-1708-42 INTELLIGENT CONVEYOR SYSTEM; (2) POUCH OPEN ASSEMBLIES; (2) POUCH SEALING ASSEMBLIES; POUCH REJECT ASSEMBLIES; VIDEOJET VJ9550 PRINT AND APPLY LABELING MACHINE; (2) FINAL VISION CHECK ASSEMBLIES; DENSO VS050A3-AV6-NNN 6-AXIS ARTICULATED ROBOTS; WAND LOAD STATION WITH KEYENCE LIGHT CURTAINS; DESICCANT LOAD STATION; STACKER CAROUSEL; ZAXIS LEAK TESTER ASSEMBLY; PCB CHECK ASSEMBLY; UV CURE ASSEMBLY; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 8.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
2004 | MIQ PARTNERS | 2004 CARTRIDGE PRINTING MACHINE |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; VIDEOJET 7330 LASER VISION SYSTEM; (2) PRINTEX G8-60/85 AUTOMOTIVE WIPER HOUSING PRINTERS; ICON VISION SYSTEM; TEXT VISION SYSTEM; OFFLOAD - REJECT ASSEMBLY; (2) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 8FT AND 8.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES; FUMEX FA1-D AIR FILTRATION & FUME EXTRACTION SYSTEM; WHISPERFLOW FILTRATION SYSTEM.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2001 PCBA TO FLUIDIC MACHINE |
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: PCBA AND FLUIDIC LOAD ASSEMBLIES; (4) TAPE ASSEMBLIES WITH DENSO HM-40602M-W 4-AXIS 600MM SCARA INDUSTRIAL ROBOTS; (4) ROLL ASSEMBLIES; SEALING WAX DISPENSE ASSEMBLY WITH NORDSON EFD PICO TOUCH CONTROLLER; WAX CHECK ASSEMBLY; HEAT EMBOSS ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (14) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 7.5, 7.75, AND 9.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2008 | MIQ PARTNERS | 2008 FLUIDIC PROCESSING MACHINE |
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: 20-BAY CARTRIDGE HOUSING STACKER WITH DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOT; CALIFORNIA VIBRATION FEEDERS, INC. PIEZO DISK LOADER; UV DISPENSE ASSEMBLY; UV CURE & CAMERA ASSEMBLY; (6) BIMBA PNEUMATIC CYLINDERS; (2) WAX DISPENSE ASSEMBLIES WITH DENSO HSR048A1-N17-W5N 4-AXIS 480MM SCARA INDUSTRIAL ROBOTS AND NORDSON EFD PICO TOUCH CONTROLLERS; WAX REFLOW ASSEMBLY; LEAK TEST STATION WITH ZAXIS ISAAC HD 4-CHANNEL MULTI-FUNCTION LEAK DETECTOR; CORONA TREATMENT ASSEMBLY; PRINTEX G8-100/115 3-POSITION PAD PRINTER WITH MITSUBISHI GOT2000 GRAPHIC OPERATION TERMINAL; PRINT CHECK VISION SYSTEM; CVF IN060 VIBRATORY FEEDER; OFFLOAD - REJECT STATION; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 9.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2000 |
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: (1 EACH) PCB LOAD AND UNLOAD ASSEMBLIES WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOTS; PLASMA TREATMENT ASSEMBLY WITH ENERCON BLOWN-ION SERIES PLASMA TREATER; NEST CLOSE ASSEMBLY; SAM DISPENSER; SAM INSPECT PLATFORM WITH 15-PLACE ACCUMULATOR; (2) DI WASH ASSEMBLIES; (2) LIFT & DRY ASSEMBLIES; (7) PCB FAN DRY ASSEMBLIES; (3) CHEMICAL DISPENSE VISION ASSEMBLIES WITH NORDSON EFD PICO TOUCH CONTROLLERS; TREHALOSE VISION SYSTEM WITH PICO TOUCH CONTROLLER; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (3) US MOTORS ELECTRIC BLOWERS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 7.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
2003 | MIQ PARTNERS | 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE |
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: SUBASSEMBLY LOAD; 20-BAY CARTRIDGE HOUSING STACKER WITH (2) DENSO HM-40702M-W 4-AXIS 700MM SCARA INDUSTRIAL ROBOTS; (2) CVF IN060 VIBRATORY FEEDERS; DESICCANT PRESENCE VISION SYSTEM; PIERCER PRESENCE VISION SYSTEM; (2) BRANSON 2000XD ULTRASONIC WELDERS; PCB READ WRITE ASSEMBLY; OFFLOAD - REJECT ASSEMBLY; (4) BIMBA PNEUMATIC CYLINDERS; (4) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 14.5 AND 8FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
MIQ PARTNERS | 2002 REAGENT/PELLET LOADING MACHINE |
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: FLUIDIC LOAD GANTRY ASSEMBLY; (3) BIMBA PNEUMATIC CYLINDERS; (3) CVF IN060 VIBRATORY FEEDERS; (3) CVF IN0300 VIBRATORY FEEDERS; STOPPER LUBE ASSEMBLY; DENSO VP-6242M 6-AXIS ROBOT ARM; A05 SHUTTLE INSERT ASSEMBLY; PELLET INSPECTOR; LYO PELLET LOADER WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOT; SHUTTLE LYO PRESENCE VISION SYSTEM; SEAL LOADER; IVEK LIQUID DISPENSER WITH TMB BUFFER AND COLE-PARMER MASTERFLEX L/S PUMP DRIVE WITH EASY-LOAD 77200-30 CARTRIDGE; DROPLET DETECT EQUIPMENT; FLUID CHECK ASSEMBLY; LEAK CHECK STATION WITH ZAXIS LEAK DETECTOR; FOIL PUNCH & PLACE ASSEMBLY; FOIL TRANSFER ASSEMBLY; DOUBLE TRANSFER STATION; OFFLOAD - REJECT ASSEMBLY; (6) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 9.5FT AND 14.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2000B |
MIQ PARTNERS 2000B PRODUCTION CELL LINE ROOM C
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 8020 MODULAR CLEANROOM ENCLOSURE |
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO THE CABLE TRAY (NO CONTENTS).
|
🔒 Subscribe | |
|
|
LIBERTY PUMPS | 1102/LEH103M |
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP
|
🔒 Subscribe | |
|
|
2005 | MIQ PARTNERS | 2005 CARTRIDGE POUCHING & LABELING MACHINE |
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; CARTRIDGE REJECT ASSEMBLY; (2) CONVEYOR TRANSFER ASSEMBLIES; MAGNEMOTION MAGNEMOVER LITE 700-1708-42 INTELLIGENT CONVEYOR SYSTEM; (2) POUCH SEALING ASSEMBLIES; POUCH REJECT ASSEMBLIES; VIDEOJET VJ9550 PRINT AND APPLY LABELING MACHINE; (2) FINAL VISION CHECK ASSEMBLIES; DENSO VS050A3-AV6-NNN 6-AXIS ARTICULATED ROBOTS; WAND LOAD STATION WITH KEYENCE LIGHT CURTAINS; DESICCANT LOAD STATION; STACKER CAROUSEL; ZAXIS LEAK TESTER ASSEMBLY; PCB CHECK ASSEMBLY; UV CURE ASSEMBLY; (5) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; DORNER 205484 ETM CONVEYOR DRIVE SYSTEM WITH 8.5FT BY 2.25IN CONVEYOR [ONE CONVEYOR SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
|
|
2004 | MIQ PARTNERS | 2004 CARTRIDGE PRINTING MACHINE |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: LOAD ASSEMBLY; VIDEOJET 7330 LASER VISION SYSTEM; (2) PRINTEX G8-60/85 AUTOMOTIVE WIPER HOUSING PRINTERS; ICON VISION SYSTEM; TEXT VISION SYSTEM; OFFLOAD - REJECT ASSEMBLY; (2) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 8FT AND 8.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES; FUMEX FA1-D AIR FILTRATION & FUME EXTRACTION SYSTEM; WHISPERFLOW FILTRATION SYSTEM.
|
🔒 Subscribe |
|
|
AGILENT TECHNOLOGIES | X3815-64000 IDP-15 |
AGILENT TECHNOLOGIES X3815-64000 IDP-15 DRY SCROLL PUMP S/N: MY2034SA20
|
🔒 Subscribe | |
|
|
MIQ PARTNERS | 2002 REAGENT/PELLET LOADING MACHINE |
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: FLUIDIC LOAD GANTRY ASSEMBLY; (3) BIMBA PNEUMATIC CYLINDERS; (3) CVF IN060 VIBRATORY FEEDERS; (3) CVF IN0300 VIBRATORY FEEDERS; STOPPER LUBE ASSEMBLY; DENSO VP-6242M 6-AXIS ROBOT ARM; A05 SHUTTLE INSERT ASSEMBLY; PELLET INSPECTOR; LYO PELLET LOADER WITH DENSO HS045A1-N20-JNN 4-AXIS 450MM SCARA INDUSTRIAL ROBOT; SHUTTLE LYO PRESENCE VISION SYSTEM; SEAL LOADER; IVEK LIQUID DISPENSER WITH TMB BUFFER AND COLE-PARMER MASTERFLEX L/S PUMP DRIVE WITH EASY-LOAD 77200-30 CARTRIDGE; DROPLET DETECT EQUIPMENT; FLUID CHECK ASSEMBLY; LEAK CHECK STATION WITH ZAXIS LEAK DETECTOR; FOIL PUNCH & PLACE ASSEMBLY; FOIL TRANSFER ASSEMBLY; DOUBLE TRANSFER STATION; OFFLOAD - REJECT ASSEMBLY; (6) COGNEX DIGITAL CAMERAS; MULTIPLE FESTO STEPPER MOTORS / HANDLERS; SMC PNEUMATICS; (2) DORNER 205484 ETM CONVEYOR DRIVE SYSTEMS WITH 9.5FT AND 14.5FT BY 2.25IN CONVEYORS [ONE CONVEYOR EACH SIDE ONLY]; MODULAR ENCLOSURE WITH OMRON D4JL-2NFA-C5 BASIC / SNAP ACTION LOCK SWITCHES.
|
🔒 Subscribe |
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE
COMMERCIAL PRINTING & BINDERY EQUIPMENT
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTE...
Hammer Price:
🔒
MIQ PARTNERS 2000
CIRCUIT BOARD, SMT & SEMICONDUCTOR MANUFACTURING EQUIPMENT
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER....
Hammer Price:
🔒
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE
MISC
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO ...
Hammer Price:
🔒
LIBERTY PUMPS 1102/LEH103M
TANKS, PUMPS & STORAGE EQUIPMENT
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP...
Hammer Price:
🔒
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER WITH QUIKLOK STAND. SY...
Hammer Price:
🔒
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE
CHEMICAL PROCESSING EQUIPMENT
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE
MISC
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDE...
Hammer Price:
🔒
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER AND DELL LATITUDE 5501...
Hammer Price:
🔒
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE
CHEMICAL PROCESSING EQUIPMENT
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
MIQ PARTNERS 2000
CIRCUIT BOARD, SMT & SEMICONDUCTOR MANUFACTURING EQUIPMENT
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER....
Hammer Price:
🔒
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE
MISC
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO ...
Hammer Price:
🔒
LIBERTY PUMPS 1102/LEH103M
TANKS, PUMPS & STORAGE EQUIPMENT
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP...
Hammer Price:
🔒
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE
PACKAGING EQUIPMENT
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SY...
Hammer Price:
🔒
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE
COMMERCIAL PRINTING & BINDERY EQUIPMENT
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
DENSO TP-RC 7/8
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
DENSO TP-RC 7/8 TEACH PENDANT S/N: 410100-1761...
Hammer Price:
🔒
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE
MISC
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO ...
Hammer Price:
🔒
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE
MISC
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDE...
Hammer Price:
🔒
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER AND DELL LATITUDE 5501...
Hammer Price:
🔒
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE
CHEMICAL PROCESSING EQUIPMENT
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
MIQ PARTNERS 2000
CIRCUIT BOARD, SMT & SEMICONDUCTOR MANUFACTURING EQUIPMENT
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER....
Hammer Price:
🔒
LIBERTY PUMPS 1102/LEH103M
TANKS, PUMPS & STORAGE EQUIPMENT
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP...
Hammer Price:
🔒
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE
PACKAGING EQUIPMENT
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SY...
Hammer Price:
🔒
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTE...
Hammer Price:
🔒
MIQ PARTNERS 2000
CIRCUIT BOARD, SMT & SEMICONDUCTOR MANUFACTURING EQUIPMENT
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER....
Hammer Price:
🔒
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE
COMMERCIAL PRINTING & BINDERY EQUIPMENT
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE
CHEMICAL PROCESSING EQUIPMENT
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTE...
Hammer Price:
🔒
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE
MISC
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDE...
Hammer Price:
🔒
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: PCBA...
Hammer Price:
🔒
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE
MISC
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO ...
Hammer Price:
🔒
LIBERTY PUMPS 1102/LEH103M
TANKS, PUMPS & STORAGE EQUIPMENT
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP...
Hammer Price:
🔒
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE
PACKAGING EQUIPMENT
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SY...
Hammer Price:
🔒
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE
COMMERCIAL PRINTING & BINDERY EQUIPMENT
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
MIQ PARTNERS 2001 PCBA TO FLUIDIC MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDES: PCBA...
Hammer Price:
🔒
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE
CHEMICAL PROCESSING EQUIPMENT
2008 MIQ PARTNERS 2008 FLUIDIC PROCESSING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
MIQ PARTNERS 2000
CIRCUIT BOARD, SMT & SEMICONDUCTOR MANUFACTURING EQUIPMENT
MIQ PARTNERS 2000 PRINTED CIRCUIT BOARD ASSEMBLY (PCBA) MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER....
Hammer Price:
🔒
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE
INDUSTRIAL AUTOMATION, CONTROLS & ROBOTICS
2003 MIQ PARTNERS 2003 CARTRIDGE HOUSING ASSEMBLY MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTE...
Hammer Price:
🔒
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE
MISC
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDE...
Hammer Price:
🔒
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE
MISC
MIQ PARTNERS 8020 MODULAR CLEANROOM ENCLOSURE, 2,895 SQ.FT. [USED AS A DEHUMIDIFICATION ROOM, UP TO ...
Hammer Price:
🔒
LIBERTY PUMPS 1102/LEH103M
TANKS, PUMPS & STORAGE EQUIPMENT
LIBERTY PUMPS 1102/LEH103M PREASSEMBLED DUPLEX SEWAGE PUMP...
Hammer Price:
🔒
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE
PACKAGING EQUIPMENT
2005 MIQ PARTNERS 2005 CARTRIDGE POUCHING & LABELING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SY...
Hammer Price:
🔒
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE
COMMERCIAL PRINTING & BINDERY EQUIPMENT
2004 MIQ PARTNERS 2004 CARTRIDGE PRINTING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUD...
Hammer Price:
🔒
AGILENT TECHNOLOGIES X3815-64000 IDP-15
MISC
AGILENT TECHNOLOGIES X3815-64000 IDP-15 DRY SCROLL PUMP S/N: MY2034SA20...
Hammer Price:
🔒
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE
MISC
MIQ PARTNERS 2002 REAGENT/PELLET LOADING MACHINE WITH BEIJER X2PRO SYSTEM CONTROLLER. SYSTEM INCLUDE...
Hammer Price:
🔒